Installation Guide for Springflex Hardwood Dance Floor Systems |
| Before you begin installing your Springflex floor, read the instructions from start to finish. If you have any questions, contact Dance Equipment International at 1-408-267-1446. These instructions can be printed directly from your web browser. |
| Section A: Tools & Materials List: |
|
What you will receive from us:
Tools you will need:
|
Section B: Pre-Installation Site Inspection: |
| 1. Subfloor Moisture Testing of Concrete
Springflex can be installed in rooms with normal humidity levels on sub-floors that are firm, level, and dry. To determine if a concrete subfloor is dry, several methods can be used: Method A: Place a sheet of plastic film on the surface of the subfloor and seal the edges with duct tape. If, after 24 hours, condensation or darkening does occur, refer to Method B.
Method B: Should method A exceed tolerance, a 72 hour calcium-chloride
test needs to be conducted on the concrete subfloor (ASTM F-1869). For
emission levels of up to 6lbs. of pressure, use Polyfelt with fully
taped seams. For levels up to 10lbs., use 6mil. plastic underneath as
a secondary moisture barrier with fully duct-taped seams. For readings
in excess of 10lbs., corrective measures must be taken in order to successfully
install Springflex. See section E. figure 1 for additional information
on Secondary Vapor Barrier.
|
| Section C: Preparing For Installation |
| 1. Subfloor Tolerance:
Subfloors can be any firm surface such as concrete, plywood, sheet vinyl, or smooth tiles, etc. Surface variation should not exceed 3/16" within a ten-foot radius. To Determine flatness of the subfloor, use the edge of the Springflex flooring board. Correct minor low spots by filling with tar paper or roofing felt. Extensive low spots may require a levelling compound. Scrape, sand, or grind any high areas. |
| Section D: Expansion and Contraction Planning |
| 1. Planning for Expansion
|
|
It is vital in the planning of the job layout that you understand the unique nature of the Springflex product. This is not a veneer product (plywood); it is solid wood throughout. Always allow for proper expansion space around the perimeter of the floor. the rule is 1/4" expansion space for every 10 feet of width ON BOTH SIDES! The rule for expansion on the length is 1/8" for every 10 feet of length on both ends. 2. Expansion Space -- Doing the MathTo calculate the correct expansion space for width of floor use the following table: Expansion Formula = 1/4" per 10 foot span each side -- 1/2" per side minimum. 20 ft. span = 1/2" expansion per side 30 ft. span = 3/4" expansion per side 40 ft. span = 1" expansion per side 50 ft. span = 1 1/4" expansion per side 3. Preparing for Expansion Needs |
| Section E: Underlayments |
| 1. Secondary Vapor Barrier
Should the preliminary moisture tests exceed specifications, an additional layer of 6 mil. plastic is required. Run plastic 4" up wall and tape in place with 3M blue painter's tape. Overlap plastic 8" and tape seam with duct tape. Lay plastic in opposite direction of Polyfelt to minimize where joints line up. Run line of duct tape on seam where plastic meets subfloor and at a surface seam after lapping seam 8 inches.
Loose lay Polyfelt with the plastic side up. Overlap the built-in flange and seal the seam along its entire length with duct tape. Extend Polyfelt 4" up the wall and tape in place with 3M blue painter's tape to hold it up and out of the way. This extra material will create the tuck necessary to guard against moisture invasion through the perimeter walls. Should the floor have a plastic membrane under the Polyfelt, it should be tucked and trimmed as well (See G-4). Note: Make sure you trim your expansion cavity high enough to accomodate all the material that will be involved in the tuck.
|
| Section F: Pre-Installation Material Inspection |
| 1. Inspect Material
Examine all material for any defects before installation. Should any defects be present, STOP THE JOB and contact your representative right away. Do not install any plank that is obviously defective. We strive to make a product that is second to none in quality. However, the time to correct a possible defect is before the material is installed.
Many Springflex products have a plastic film adhered to the back of the board. This is designed to balance the top with the bottom of the plank which makes a more dimensionally stable floor. STOP! -- Do not remove Polyfilm backer! |
| Section G: Installing Quick-Clip System |
| 1. Starting Line
Choose a long straight wall as your starting wall To start your first row of boards, tack and stretch string 1/2" away from wall, and 1/2" above surface of the floor height. The string acts as a guide to help keep the boards in a straight line.
A minimum space of 1/2" must be left along all perimeter walls and other vertical obstructions. Extra large rooms or wide runs of flooring will require larger expansion gaps. For runs wider than 20 feet see section D-2.
It is important to protect the edge of the floor from moisture invasion at exterior walls. Untape the Polyfelt and secondary vapor barrier (if one was required). Take a scrap of flooring and gently push the under-layment into the cavity. Lay your row of flooring to where you want the edge to be according to your expansion needs.
Cut off excess material from tuck-and-wrap process. Remember to check your clearance to insure floor can easily move in and out of expansion cavity. Make sure clearance is uniform around entire perimeter. A high area of the slab could result in a section of the floor not being able to move freely.
If your starting wall is irregular or out of square, scribe and cut the first row of boards to match variations. A simple scribe can be made by drilling a pencil-sized hole 1/2" in from an expansion spacer. Use as shown in the illustration.
Begin in the left-hand corner with a full uncut plank. Lay the plank upside down and hammer the end of the clip with the holes into the clip groove (slot) on the underside of the plank. The long end of the clip without holes must project in the direction of the tongue.
The distance between the clips should be about 18" on center (four clips per six foot plank). The first and last clip at the end of each row must be 2" to 4" from the wall.
Glue and place the end joints together first; then use a hammer and tapping block against tongue to tap boards firmly together along the length. When the planks are tight, press down on the plank to engage the clip. To effectively seat the end joint, tap board into place starting at its open end and tapping back along its length into the floor. Note: Do not strike the edge of the board with the hammer or drive boards together too hard. This avoids damaging the edges of the board.
Once the clips are in, turn the plank right side up and install the first board with the groove side towards the starting wall. The tongue side will be away from the wall with the long arm of the clip exposed. Apply Header Joint Adhesive to the inside bottom of the end joint groove (as shown) and repeat with succeeding boards to complete first row.
To start the next row of boards, begin with the cut piece left over from the first row (if cut piece is under 16", cut 16" or more from a full plank to stagger the end joint). This end-gap spacing is critical to the structural integrity of the floor. Spacing end joints 16" or more creates a proper interlocking strength for the floor. To prevent clips from touching each other, alternate them (in line) by approximately 2" back and forth as you proceed across the floor.
Clips need to be doubled up at places where the floor turns a corner or goes through a doorway. It is also important to narrow the clip spacing to 12"-14" and place clips within 2"-4" at ends when you go through a narrow aisleway. Using this method in narrow aisleways will help prevent gaps from occuring. |
| Section H: Molding, The Finishing Touch |
| Lip-Over Reducer:
For transition from flooring to existing floor.
Do not attach any transition moldings directly through the lip-over part of the molding. The transition molding is secured by the use of epoxy or liquid nails or fastened with a nail directly to the subfloor. This is critical since Springflex is a floating system and the movement of the floor is not to be impeded or restricted in any way.
1. Drill Hole with 7/16" masonary drill bit.
2. Instert Header Joint Adhesive into hole.
3. Tap 1/2" wood dowel into hole.
4. Place two part epoxy, liquid nails, or urethane glue on concrete slab.
5. Press molding into adhesive.
6. Nail through molding into dowel.
Note: This method only applies to installation over concrete. For installation over wood subfloor follow instructions 4 through 6. |